Skip to content
ARTIMISTCREATIVE PRODUCTION
SearchSTART A PROJECT
West building level one daylight-factor analysis with a colour scale and calculation grid
West / Level 01 / daylight-factor screening

Technical / Environmental screening study

Daylight, across 18 levels.

An 18-level daylight-factor study translating a four-building model into comparable diagrams and a traceable calculation record.

Artimist ProductionsProject study / 2026Explore the study ↓

01 / The design question

How can daylight performance be compared consistently across different buildings and floor plates?

02 / The approach

  1. Evaluate 18 levels across the West, North, South and Tower buildings using a common CIE overcast-sky baseline.
  2. Use a one-metre calculation grid at 0.8 metres above the slabs, with 12,794 accepted points recorded in the deliverables.
  3. Pair the Radiance results with consistent diagrams, a results register and model overlays so assumptions and locations remain traceable.

Explore the geometry

Step inside the model.

Open / share model ↗

Browse all client model previews ↗

Rotate, zoom and inspect the source geometry. Use the perspective, top, front, side and layer controls to explore the project.

03 / Deliverables

  • 18-level analysis report
  • Daylight-factor diagrams
  • Calculation and results registers
  • Rhino overlays and data exports

What the work makes clear

A consistent visual language allows design teams to compare the floor plates while retaining the numerical record behind each diagram.

Continue exploring

Another perspective.

All case studies ↗

Your next project

Bring us the question.
We’ll help define the next step.

Share your plans, references or current model. We’ll help establish the right scope and deliverables.

Start a conversation ↗
Visual archive

Want to scan more work before reading another case study?

Browse the wider visual archive for residential interiors, architecture, technical plates and visualization studies.

Browse visual archive

ARTIMIST / INTERACTIVE STUDIO

Your project.
Every angle.

See and interact with your model through our site.

Choose a project, rotate it and zoom into the details. Explore architecture, interiors and product models directly in your browser.

EXPLORE THE INTERACTIVE STUDIO

13 PROJECT PREVIEWS · ROTATE · ZOOM · EXPLORE

Revised Bettina bathroom with blue walls, a white vanity and chrome fittingsFROM PRESENTATION TO EXPLORATION

Working standard

Clear before commitment.

Scope, confidentiality and handover are agreed in writing. Project-specific signed terms always take priority.

01

Scope first

Deliverables, timing, revisions and fees are agreed before production.

02

Confidential when needed

NDA-based workflows are available before sensitive files are shared.

03

Defined handover

Final PDFs, DWGs, RVTs, images, films or source files follow the written scope.

04

Honest local boundary

Required stamps, seals and statutory certification stay with the appropriately licensed local professional.

Permit-support may include package preparation, coordination and submission support when agreed. Artimist does not supply a regional architectural or engineering stamp; any legally required stamp, seal or certification must come from the appropriately licensed local professional. Read full client terms →