Start from the deliverable
A BIM brief should begin with the required outputs: coordinated drawings, schedules, quantities, visualization, consultant exchange or facilities information. Those outputs determine what must be modeled and what can remain two-dimensional. Write an exchange matrix naming the file format, expected sheets or schedules, responsible party and review point for each output.
Without that definition, teams often build unnecessary detail while missing information that matters to the actual review or handover.

Choose the right level of information
Level of detail is not a quality score. Earlier stages may need reliable massing, location and system zones; later documentation may require defined assemblies, openings and schedules. The appropriate level changes by element and project stage.
A useful execution plan records those expectations, along with software version, coordinates, naming, model ownership and the review rhythm. When linked Revit models must align, establish one shared-coordinate reference and test a linked sample early; Autodesk warns that independent internal coordinates are not enough for cross-model positioning.
Model only what the team can use, coordinate and maintain.

Coordination is a process
A coordinated model is not created by combining files once. Review the location and status of elements across architectural, structural and services models; record issues with an owner and due date, then re-check them after source-model changes. It depends on recurring checks, visible issues, assigned responsibility and confirmation that changes have been resolved in the source models.
The same discipline applies to outsourced production. Templates, families, sheet standards and handover requirements should be agreed before intensive modeling begins.
Plan the handover early
Editable files are useful only when another team can understand them. Clean naming, predictable views, documented links and an agreed model status reduce the time needed to continue the work.
A smaller, well-structured model can be more valuable than a heavier file filled with unverified detail.

Make information requirements testable
For an IFC handover, agree which objects, classifications and properties are actually required. buildingSMART's Information Delivery Specification (IDS) can express some of those requirements in a computer-interpretable form and support automated checks of IFC data. It does not replace geometric review, professional judgment or a broader project brief.
Before final handover, open a sample export in the receiving workflow. Confirm location, element names, key properties, sheets and schedules against the agreed list. Keep a record of known exclusions so the next team does not mistake a conceptual model for verified construction information.